363-206-285 System Turnup: NTP-050
Issue 2, February 2000 Page 8 of 14
DDM-2000 OC-3 MULTIPLEXER
DO ITEMS BELOW IN ORDER LISTED . . . . .FOR DETAILS, GO TO
17.
NOTE:
The section data communication channel (DCC), used for far
end communications, must be enabled at each network
element (shelf) optical interface being tested in order for the
end-to-end line tests to work. Default condition for the DCC
channel is "enabled". If it has been disabled, use the
set-fecom: command at each shelf to enable far end
communications.
At each shelf, use the set-fecom:address:com=enabled
command to ensure far end communications (fecom) is enabled.
DLP-51418. Perform optical fiber connections and verification of the integrity of
the optical span being established.
19.
NOTE:
Shelves that are part of a subnetwork being partitioned into
multiple areas require that the NSAPAREA field and level 2
IS-IS routing parameters of the ent-ulsdcc-l3:
command be set. See Section 11, Commands and Reports
in 363-206-285,
DDM-2000 OC-3 Multiplexer, TARP Release
13 and Later, User/Service Manual—Volume I
and
363-206-295,
DDM-2000 OC-12 Multiplexer, TARP Release
7, User/Service Manual—Volume I
, for an explanation of the
command parameters and 824-102-144,
Lucent
Technologies 2000 Product Family, Operations Interworking
Guide For TARP Releases
, for an explanation of the
engineering rules for subnetwork partitioning.
Use the ent-ulsdcc-l3: command to designate the
NSAPAREA field and level 2 IS-IS routing, as required.
20.
NOTE:
The rtrv-pm-line: command in the following procedure
displays performance monitoring data associated with the
OC-3 lines terminated on the system.
DLP-515Perform end-to-end OC-3 line test.
DLP-514