DLP-558: Detailed Level Procedure 363-206-285
Page 4 of 8 Issue 2, February 2000
DDM-2000 OC-3 MULTIPLEXER
Figure 4 – Sample Report From rtrv-map-neighbor Command (R15)
2. Verify system configuration is same as specified on work order or circuit order.
3. From work order or circuit order, determine the terminating (drop) nodes for
the service being established.
4.
NOTE:
Cross-connections consist of drop and pass-through connections. For
example in Figure 5, drop connections are made at Nodes 1 and 2.
Pass-through cross-connections are made at Node 3. In Figure 6,
pass-through cross-connections are made at Node 1.
NOTE:
If all 28 VT1.5s (DS1s) in the STS-1 are being passed through at the
OC-3 host node, then the cross-connection may be provisioned as either
a pass-through STS-1 or VT1.5. However, if you anticipate dropping
VT1.5s from the OC-3 node in the future, you should provision the OC-3
as VT1.5 cross-connections. Provisioning now as a VT1.5 cross-connect
will avoid a hit on traffic if the STS-1 cross-connect has to be converted to
28 VT1.5 cross-connects to drop DS1s at a later time.
From work order, circuit order, and the sketch made in Step 1, determine the
pass-through nodes for the service being established.
/* Neighbor Map for Site6NE1
=================================================================
TID Connected Thru Product Type Level 2 IS DCC
NSAP
=================================================================
Site6NE1 DDM-2000 OC-3 Y
39 840F 80 000000 0000 0000 0000 08006alad06e 00
Site7NE1 main-1 N
39 840F 80 000000 0000 0000 0000 08006alad06f 00
Site5NE1 main-2
39 840F 80 000000 0000 0000 0000 00000e3a0372 00
*/