Installation and User Manual
13
2.1.5.3 Training
THE FINAL MACHINE DOCUMENTATION MUST BE READ
The training of the operators assigned to the normal operation must follow the inst
out in the documentation of the final machine that the P3UP is fitted in, as this documentation
cannot be exhaustive.
The following categories of people require training:
1. operators assigned to transport, store and install the gauge, in order to:
• In order to ensure they are aware of the appropriate lifting and transport methods used for the parts
of the arm, as stipulated by Marposs, in order to prevent the risks associated with moving loads;
• Ensure they are aware of the correct storage procedures for the parts of the P3UP in order to
prevent damaging important parts, not only in terms of safety but also from an operational point of
view;
• Ensure they are aware of the correct P3UP installation procedures, such as wiring the electrical
parts, in order to prevent assembly errors that could generate dangerous situations for the health
and safety of the operators.
2. operators assigned to supervise the normal operation of the P3UP, in order to:
• Ensure they adhere to the applicable regulations governing the use of the product, and that they
read and following the instructions and other information provided in the attached documentation.
3. operators assigned to the maintenance of the P3UP, in order to:
• Ensure they are aware of the correct procedures for carrying out scheduled and unscheduled
maintenances activities on the P3UP.
2.1.5.4 Procedures
Before performing any operation with the P3UP described in these instructions, the Operator must check that
all safety conditions are met in order to prevent accidents.
In order to avoid hazardous situations, the operator must read section 2 of this document carefully.