EasyManua.ls Logo

Mindray iPM-9800 - Preparing to Measure AG

Mindray iPM-9800
300 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17-2
WARNING
z To avoid explosion hazard, do not use flammable anesthetic agent such as ether
and cyclopropane for this equipment.
NOTE
z The AG module is configured with automatic barometric pressure compensation
function.
17.2 Preparing to Measure AG
1. Select an appropriate watertrap according to patient category and attach it to the module.
2. Connect the gas sample line to the connector of the watertrap.
3. Connect the other end of the gas sampling line to the patient via the airway adapter.
4. Connect the exhaust tube to the gas outlet on the module to scavenge the sample gas to
the waste gas disposal system.
5. The patient monitor prompts [AG Startup].After startup is finished, [AG Warmup] is
prompted. Then the AG module enters the warm up status. After warm-up is finished,
you can perform AG measurements.
Patient monitor
Exhaust tube
Gas sampling line
Airway adapter
Vent to the patient
AG module

Table of Contents

Other manuals for Mindray iPM-9800

Related product manuals