7.3 Online Module Change Procedure
7.3.6 When user range setting is used and initial setting was made with sequence program (other system is
7 - 34
1
OVERVIEW
2
SYSTEM
CONFIGURATION
3
SPECIFICATIONS
4
SETUP AND
PROCEDURES
BEFORE OPERATION
5
UTILITY PACKAGE
(GX CONFIGURATOR-
AD)
6
PROGRAMMING
7
ONLINE MODULE
CHANGE
8
TROUBLESHOOTING
(3) Mounting of new module
(a) Mount a new module to the same slot and install the connector.
(b) After mounting the module, click the [Execution] button and make sure that the
"RUN" LED is lit. Module ready (X0) remains OFF.
(4) Operation check
(a) To make an operation check, click the [Cancel] button to cancel control
resumption.
(b) Click the [OK] button to leave the "Online module change" mode.