EasyManua.ls Logo

Nordson Asymtek Spectrum Series - Figure 4-2 Connecting the Power and Air Supply

Nordson Asymtek Spectrum Series
238 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Power-Up and Testing 4-3
To connect the system to the facility air supply:
CAUTION! Make sure that facility air pressure meets the requirements specified in
10.2 Facility Requirements. Higher pressures will damage the dispensing
system.
1. Locate the facility quick-disconnect air hose (Figure 4-2).
2. Make sure each dispensing system Main Air Regulator is closed. Verify facility air pressure
is at 0 psi.
3. Connect the facility air hose(s) to the quick-disconnect(s) on the Main Air Regulator(s).
4. If not already connected, also connect the air hose(s) to the facility air supply.
! Use pliers to tighten the connections.
5. Slowly open the facility air valve and listen for leaks.
! If there is an air leak, identify the source, shut off facility air, and fix the leak before
proceeding.
Item Description
1 Main Air Pressure Regulator and Gauge Sets
2 Quick-Disconnect Fittings
Figure 4-2 Connecting the Power and Air Supply
1
2

Table of Contents

Related product manuals