EasyManuals Logo

Nordson Asymtek Spectrum Series User Manual

Nordson Asymtek Spectrum Series
238 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #84 background imageLoading...
Page #84 background image
4-18 Power-Up and Testing
To check Conveyor upstream and downstream SMEMA communication:
1. Perform a Service Shutdown as specified in the 2.11 Service Shutdown.
2. Attach the TS-01 upstream and downstream cable adapters to the TS-01 I/O Test Box.
3. Attach the TS-01 upstream and downstream cables to the appropriate SMEMA connectors at
the rear of the dispensing system (
Figure 4-12).
Figure 4-12 SMEMA Connections
4. Make sure that all of the IO/INDEP switches along the edge of the TS-01 I/O Test Box are
all set to
INDEP.
5. Start the dispensing system as described in
4.5 Powering on the Dispensing System.
6. Make sure that the
DRIVERS/OPTO I/O switch in the corner of the TS-01 I/O Test Box is set
to
OPTO I/O.
7. In the FmXP Main Window, click on
Configuration and then select Setup Conveyors.
8. Click on
I/O Test and then on the Outputs 0-31 tab (Figure 4-13).
9. Locate the upstream and downstream bits. Perform the actions specified in
Table 4-1.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nordson Asymtek Spectrum Series and is the answer not in the manual?

Nordson Asymtek Spectrum Series Specifications

General IconGeneral
BrandNordson
ModelAsymtek Spectrum Series
CategoryDispenser
LanguageEnglish

Related product manuals