EasyManua.ls Logo

Nortel CallPilot - Page 142

Nortel CallPilot
182 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
142 Chapter 11 Replacing or adding voice processing boards
requirement between the power outlets of the CallPilot server
and the power outlets of the switch.
11
Power up the server and log on to Windows.
Note: When the Windows New Hardware Found Wizard pops
up, press the next button and select the presented Nortel MPB
driver.
12
Run the Configuration Wizard to detect the new hardware.
For instructions, refer to the Installation and Configuration Task List
(NN44200-306).
Result:The MPB96 board replacement is complete.
13
Test the multimedia channels to ensure that the new MPB96 board
is functioning properly.
Refer to the Installation and Configuration Task List (NN44200-306).
—End—
Nortel CallPilot
703t Server Maintenance and Diagnostics
NN44200-702 01.03 Standard
5.0 3 April 2007
Copyright © 2007, Nortel Networks Nortel Networks Confidential
.

Table of Contents

Other manuals for Nortel CallPilot

Related product manuals