EasyManuals Logo

Precor Precision 400 Series User Manual

Precor Precision 400 Series
254 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #193 background imageLoading...
Page #193 background image
12. Carefully, remove temporary support blocks and set the machine on the floor. Stab-
ilize and level the chine left-to-right stability using the outrigger side tube stabilizer
feet.
13. If the console was removed, reinstall the console and reconnect the data , Ground,
and Heart Rate cables, see "Console Replacement" on page93.
Contact Precor Customer Support at support@precor.com or 800.786.8404 with
any questions.
Page 185
6 Available Replacement Procedures
Outrigger Side Tube Replacement

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Precor Precision 400 Series and is the answer not in the manual?

Precor Precision 400 Series Specifications

General IconGeneral
BrandPrecor
ModelPrecision 400 Series
CategoryTreadmill
LanguageEnglish

Related product manuals