EasyManua.ls Logo

Sartorius Cubis Series - Page 158

Sartorius Cubis Series
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
158 Cubis MSU User Manual
Shipping the Balance
t Place the shield plate/draft shield into the opening.
t Close the box.
Transporting the Parts (Small Analytical Draft Shield)
t Get the box ready for the individual parts of the balance.
t Get the foam pieces ready.
t Place the balance parts on top of each other.
1. Upper draft shield panel
2. Shield plate/draft shield
3. Pan support
2
1
3

Table of Contents

Other manuals for Sartorius Cubis Series

Related product manuals