1.2 PRE-INSTALLATION CHECK
Prior to beginning installation, it is recommended to inspect the site and verify
that the X-ray room complies with Pre-installation requirements, such as:
Incoming Line.
Main Switch and Safety Devices.
Conduits.
Space Requirements.
(Refer to the “Pre-Installation” document.)