SECTION 1 INTRODUCTION
This Pre-Installation document provides the information and data needed to
plan and qualify the customer site prior to equipment delivery and installation.
This document considers only the Generator and its associated components.
Product information, environmental and electrical requirements are specified.
For system-related requirements, such as room layout, and system
interconnections, refer to documentation provided with other subsystems.
1.1 RESPONSIBILITY OF PURCHASER
Site planning and preparation are the responsibilities of the purchaser. The
following points should be considered fundamental to the customers
Pre-Installation activities; addition work may be needed depending on specific
site circumstances:
Install required material prior the delivery of the system components.
Complete room floor, ceiling and wall finish.
Install conduit, duct, and raceway.
Install proper size junction boxes with covers at locations specified in the
installation plan.
Install mains power of proper voltage output and adequate kVA rating.
Install all safety devices according to this document and Local Codes.
Provide current room dimensions, including hall way and entry door
sizes.
Complete and proper Pre-Installation will avoid delays and
confusion.
Note .