EasyManua.ls Logo

Sedecal SHF-310 - Control Console Installation (Optional)

Default Icon
427 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HF Series Generators
Installation
IN-1052R0
14
2.1 CONTROL CONSOLE INSTALLATION (OPTIONAL)
1. Control Console can be freestanding, wall supported or mounted on an
optional Pedestal. Console is provided with several mounting holes on
the bottom for anchoring to the Pedestal or another support.
Console CPU Boards and AEC Control Board can be located inside the
Console (standard) or inside the Generator Cabinet (for Serial
communication).
2. When a Pedestal is used, secure the Pedestal to the floor through the
anchoring holes on its base and place the base cover. Attach the Console
to the Pedestal using the mounting holes on the bottom of the Console.
3. When the Console is wall supported, secure the support to the wall and
attach the Console to the support using the mounting holes on the bottom
of the Console.
4. Leave a sufficient working area around the equipment until its final
assembly.

Table of Contents

Related product manuals