ELECTRICAL INSTALLATION 5
45
Subject to change without notice
OPERATING INSTRUCTIONS | Master Data Analyzer
5 Electrical installation
All components of the Master Data Analyzer are connected with each other at the factory.
The system only needs to be connected to the voltage supply.
HAZARD
Risk of injury due to electrical current
The Master Data Analyzer is connected to the power supply (AC
100 to 264 V/50 to 60 Hz).
Only a qualified electrician or trained person working under the guidance and supervision
of a qualified electrician is permitted to work on electrical systems or equipment, and they
must comply with the electrical regulations.
Improper handling of live devices may lead to severe personal injury or death by electric
shock.
Measures
Electrical installation and maintenance work must only be performed by electrically
qualified personnel.
Standard safety requirements must be met when carrying out any work on electrical
systems or equipment.
Do not touch any live parts.
In the event of danger, immediately disconnect the device from the grid.
Electrical connections may only be made or disconnected when there is no power in the
system.
Only switch on the supply voltage when the connection tasks have been completed and
the wiring has been thoroughly checked.
Only carry out maintenance and repair work when the power is off.
Always use original fuses with the specified current rating.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SICK Master Data Analyzer and is the answer not in the manual?

SICK Master Data Analyzer Specifications

General IconGeneral
BrandSICK
ModelMaster Data Analyzer
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals