7 OPERATION
8020065-ZSP4/2017-08-10|SICK
OPERATING INSTRUCTIONS | Master Data Analyzer
Subject to change without notice
7 Operation
7.1 Safety information
You are responsible!
▸
Follow the notes in chapter 2 Safety.
Personnel requirements
All activities may only be carried out by trained and authorized personnel.
Risk of injury and/or damage caused by faulty operation.
Risk of injury and/or property damage from absence of qualification and/or incorrect and
non-intended use.
Measures
▸
Follow the instructions on proper operation.
▸
Only use the system in perfect working order and for its intended purpose, keeping
safety and potential dangers in mind, and in compliance with the operating
instructions.
▸
Never exceed the permitted technical limit values.
▸
Do not do work on the system if:
• You do not have the required qualification
• You have not received full instructions from the operating entity
• If you have not completely read or understood these operating instructions.
Risk of injury when lifting heavy objects.
There is a risk of injury when placing down and removing the objects to be measured.
Objects weighing up to 30 kg can be measured.
Measures
▸
Consider ergonomic aspects when placing down and removing the objects.