Connection
4.14 Connecting the Power Module with the CM PM-E 7/8" Connection Module
ET 200pro distributed I/O system
134 Operating Instructions, 03/2013, A5E00335544-08
Connecting the Power Module with the CM PM-E 7/8" Connection
Module
Introduction
You connect the load voltage supply 2L+ to the CM PM 7/8" connection module using the
7/8" connector X01.
The power module and bus module are mounted on the rack.
Screwdriver and stripping tool for wiring the 7/8" connector, if you are fabricating your own
cables.
● Prefabricated cable with 7/8" cable connector. The cable is available in different lengths.
● If you are fabricating your own cables:
– 7/8" connectors
– 3-wire cable