EasyManua.ls Logo

Siemens ET 200pro - Page 137

Siemens ET 200pro
545 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connection
4.15 Connecting the Outgoing Module with the CM PM-O PP Connection Module
ET 200pro distributed I/O system
Operating Instructions, 03/2013, A5E00335544-08
137
Pin assignment of the push-pull cable connector
View of the push-pull cable connector
Terminal
Assignment X01 OUT/X02 OUT
Electronic/encoder supply and load voltage supply X01
OUT
1
1L+ electronics/encoder supply
2
Ground for electronics/encoder supply 1M
3
2L+ load voltage supply
4
Ground for load voltage supply 2M
5
Functional earth
Electronic/encoder supply and load voltage supply X02
OUT
1
1L+ electronics/encoder supply
2
Ground for electronics/encoder supply 1M
3
2L+ load voltage supply
4
Ground for load voltage supply 2M
5
Functional earth
Connecting the PP cable connector
1. Insert the CM PM-O PP connection module into the PM-O DC 2x24V outgoing module.
2. Press the push-pull cable connector into the associated sockets on the CM PM-O PP
connection module. The connectors must engage. Ensure that the locking mechanism
between the connector and socket is properly applied.
Note
The CM PM
-O PP connection module can only be mounted on the PM-O outgoing
module.
Closing the unused socket
Always cover any unused push-pull sockets with caps in order to achieve degree of
protection IP65, IP66, or IP67.
See also
PM-O DC 2x24V outgoing module (Page 324)

Table of Contents

Related product manuals