EasyManua.ls Logo

Siemens ET 200pro - Page 48

Siemens ET 200pro
545 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounting
3.2 Rack
ET 200pro distributed I/O system
48 Operating Instructions, 03/2013, A5E00335544-08
Required tools
Wrench or screwdriver, matching the selected fixing screws.
Stripping tool and crimp tool for the grounding cable.
Required accessories
Table 3- 1 Rack and grounding cable
For...
you can use...
Description
Outer fixing screws M8 cylindrical head screw in accordance
with ISO 1207/ISO 1580
(DIN 84/DIN 85)
Select the screw length to match
your setup.
You also need 8.4 mm washers
according to ISO 7092 (DIN 433)
M8 hexagonal head screw according to
ISO 4017 (DIN 4017)
Grounding cable Insulated cable, conductor cross-
section: min. 4 mm
2
You also need an M8 ring cable lug
and an M8 spring lock washer
Mounting the rack and connecting functional ground (FG)
1. If necessary, mark the mounting holes on the mounting base, then drill holes with a
diameter of 8.5 mm
±0.2
mm.
2. Screw-mount (M8 screws) the rack onto the carrier.
3. Strip the grounding conductor and functional ground (FG) (Cu braid, for example), then
crimp on an M8 ring cable lug.
4. Fasten the grounding conductor using one of the bore holes of the rack: Slip the spring
lock washer, the washer and the cable lug onto the mounting screw, then screw the rack
onto the carrier.
5. Connect the opposite end of the grounding cable to ground potential.
Note
Ensure adequate equipotential bonding.
Figure 3-3 Grounding a narrow rack

Table of Contents

Related product manuals