3-2
Batch
flexible
, Manual
C79000-G7076-C650-02
The following requirements apply to working with BOM:
1. An essential requirement for recipe creation is that the equipment
structure and also the automation functions (AF) of the PLC systems be
configured and specified.
2. You must possess the authorization needed for the work you intend to
carry out with BOM (see Chapter 3.3.5).
3. WinCC must be installed before measured values, users and so on can be
taken over.
Requirements
BATCH flexible Object Manager