EasyManua.ls Logo

Spectroquant Pharo 300 - Page 100

Default Icon
456 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Spectroquant
®
Pharo 300
100
ba75703d07 04/2014
5 If necessary, enter intervals for up
to 4 timers.
6 If necessary, enter the AQA2 tar-
get value and AQA2 tolerance.
7 If necessary, select from how
many single measurements the
documented measured value is
calculated.
8 If necessary, set whether a
reagent blank value is required.
9 If necessary, set whether a user
calibration is possible and/or
required.
10 Complete the programming of the
method with [Complete].
The method is programmed and
selected for measuring.

Table of Contents