EasyManua.ls Logo

Sun Microsystems Netra T2000 - Page 4

Sun Microsystems Netra T2000
116 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
iv Netra T2000 Server Installation Guide • September 2006
Installing the Air Filter 16
Installing Optional Components 17
Slide Rail Assembly Notes 18
Safety Precautions 20
4-Post Rackmounting Options 22
Hardmounting the Server in a 19-Inch 4-Post Rack 22
▼ To Install a Server With a Hardmount 19-Inch 4-Post Rack 22
Mounting the Server in a Sliding Rail Mount 19-Inch 4-Post Rack 26
▼ To Install a Server With a Sliding Rail Mount in a 19-Inch 4-Post Rack 26
Hardmounting the Server in a 600-mm 4-Post Rack 33
▼ To Install a Server With a Hardmount in a 600-mm 4-Post Rack 33
Installing a Server With a Hardmount in a 19-Inch 4-Post Rack for Use With the
Cable Management Assembly 41
▼ To Install the Slide Rail Assemblies 42
▼ To Install the Cable Management Assembly 47
▼ To Verify the Operation of the Slide Rails and the CMA 50
2-Post Rackmounting Options 56
Hardmounting the Server in a 23-Inch 2-Post Rack 56
▼ To Install a Server With a Hardmount in a 23-Inch 2-Post Rack 56
Hardmounting the Server in a 19-Inch 2-Post Rack 61
▼ To Install a Server With a Hardmount in a 19-Inch 2-Post Rack 61
Data Ports and Cabling Notes 67
Port Locations 67
Cabling Notes 68
Connecting Cables 69
▼ To Connect the Ethernet Network Cables 69
▼ To Connect the SC Serial Management Port 70
▼ To Connect the SC Network Management Port 71
Input Power Cables 72

Table of Contents