iv Netra T2000 Server Installation Guide • September 2006
Installing the Air Filter 16
Installing Optional Components 17
Slide Rail Assembly Notes 18
Safety Precautions 20
4-Post Rackmounting Options 22
Hardmounting the Server in a 19-Inch 4-Post Rack 22
▼ To Install a Server With a Hardmount 19-Inch 4-Post Rack 22
Mounting the Server in a Sliding Rail Mount 19-Inch 4-Post Rack 26
▼ To Install a Server With a Sliding Rail Mount in a 19-Inch 4-Post Rack 26
Hardmounting the Server in a 600-mm 4-Post Rack 33
▼ To Install a Server With a Hardmount in a 600-mm 4-Post Rack 33
Installing a Server With a Hardmount in a 19-Inch 4-Post Rack for Use With the
Cable Management Assembly 41
▼ To Install the Slide Rail Assemblies 42
▼ To Install the Cable Management Assembly 47
▼ To Verify the Operation of the Slide Rails and the CMA 50
2-Post Rackmounting Options 56
Hardmounting the Server in a 23-Inch 2-Post Rack 56
▼ To Install a Server With a Hardmount in a 23-Inch 2-Post Rack 56
Hardmounting the Server in a 19-Inch 2-Post Rack 61
▼ To Install a Server With a Hardmount in a 19-Inch 2-Post Rack 61
Data Ports and Cabling Notes 67
Port Locations 67
Cabling Notes 68
Connecting Cables 69
▼ To Connect the Ethernet Network Cables 69
▼ To Connect the SC Serial Management Port 70
▼ To Connect the SC Network Management Port 71
Input Power Cables 72