EasyManua.ls Logo

Suzuki LT-Z400 2003 - Inspection

Suzuki LT-Z400 2003
305 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSPECTION
IGNITION
COIL
PRIMARY
PEAK
VOLTAGE
Remove the front fender, side cover, fuel tank. (
c:::r
e-4)
Remove the spark plug cap.
Conne
ct
a new spark plug
to
spark plug cap and ground it to
the
cylinder head.
NOTE:
Make sure that the spark plug cap and spark plug are connected
properly
and
the battery is fully-charged.
Measure
ig
nition coil primary peak vortage using the multi circuit
tester
in
the following procedure.
Connect
th
e multi
ci
rcuit tester with the peak vollage adaptor
as
follows.
<±>
Probe: BlackIWhile lead wi
re
or
Ground
e Probe: Black
NOTE:
Do not disconnect the ignition coil primary wire.
dEl
09900-25008:
Multi
Ci
rcuit
tester
set
I
When
using
the
multi
circuit
tester
and
peak
volt
adap-
tor
, refer
to
the
appropr
iate
Instruction
manual.
Shift
the transfer to the neutral position and tum the ignition
switch to the
"
OW
position.
Press the starter button and allow the engine to crank for a
few seconds, and then measure the ignition
coil primary peak
voltag
e.
Repeat the above procedure a few limes and measure the
hig
he
st ignition coil primary peak voltage.
~
Tester
knob
indication
: Voltage (
:-::
)
~
Ignition
coli
primary
peak
voltage: More than 130 V
A
WARNING
While
testing
.
do
not
touch
the
tester
probes
and
spark
plug
to
prevent
receiving an
electric
shock
.
If the voltage
is
lower than the standard values, inspect the
ig
n
i-
tion coi
l.
(
C::
7"7-20)
ELECTRICAL
SYSTEM
7·19
.-

Table of Contents

Related product manuals