• Shift the transmission to the neutral position, turn the ignition
switch to the
wOW position.
•
Pr
ess the starter button and allow the engine to turn f
or
a few
seconds,
an
d th
en
measure
the
pickup coil and signal coil
peak voltage.
• Repeat the above procedu
re
a few times and measure the
highest pickup
coil and signal coil peak
vo
ltage.
~
Tester
knob
indication
: Voltage (
:-:-:
)
_
Pickup
call
peak
voltage
:
More
than
2.0 V
Signal
call
peak
voltage
:
More
than
0.1
V
PICKUP COIL
AND
SIGNAL
COIL RESISTANCE
•
Disconnect the generator coupler
<D
.
Measure the resistance between the lead wires using the multi
circuit lest
er
. If the resistance is not within the spcified value, the
pickup
coil and signal coil must be replaced.
r!EI
09900
~
25008:
Multi
circuit
tester
set
\
~
Tester
knob
indication:
Resistance
(0)
_ Pickup
coil
resistance: 350 - 670 n (Blue - Green)
Signal
coil
resistance: 0.
09
- 0.5 n (Black - White)
ELECTRICAL
SYSTEM
7·
21
Peak volt adaptor
~
~~=
@
~
LQ;j
[':i
Generator
i!Z
Signal
coil l :==:'J