Registration considerations
BMTW-SVN01F-EN 247
7. At step 1, type the locking code and complete the worksheet in the
Registration Requirements dialog.
Figure 109. Registration Requirements
8. Follow the instructions to complete the registration using the base
Tracer Summit authorization code (E1154).
9. Click Finish.
10. The base Tracer Summit system features are now enabled. Use this
base Tracer Summit system software to create and configure all the
objects, devices, and points for the site. The base Tracer Summit sys-
tem should be used throughout the commissioning and check-out
phase of the operation.
IMPORTANT:
It is strongly recommended that you do not register the Critical Control
System authorization code until the site is finished and operational.
Once the Critical Control System authorization code has been regis-
tered, system changes and operator actions will require an operator
authentication dialog. This authentication process can be very cumber-
some and time-consuming during site creation and commissioning.
IMPORTANT:
Service technicians often have many different sites for many different
customers on their PCs. It is important to note that once the Critical
Control System authorization code has been registered, every site on

Table of Contents

Other manuals for Trane Tracer MP581/AH541

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane Tracer MP581/AH541 and is the answer not in the manual?

Trane Tracer MP581/AH541 Specifications

General IconGeneral
BrandTrane
ModelTracer MP581/AH541
CategoryControl Systems
LanguageEnglish

Related product manuals