EasyManuals Logo

Wacker Neuson EZ17 User Manual

Wacker Neuson EZ17
256 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #116 background imageLoading...
Page #116 background image
5-34 OM EZ17 us 1.0 * ez17b510.fm
5
The check pin K (red) must be fully retracted.
Setting down an attachment
WARNING
Crushing hazard when removing attachments!
If an attachment is not removed correctly, it can tip over and cause serious
injuries or death.
Ensure that no one is in the danger zone.
Lower the attachment to level and firm ground ensuring stability.
1. Lower the attachment to about 5 – 10 cm (2 – 4 in) above the ground.
2. Actuate switch 40.
The buzzer sounds.
3. Press and hold foot-operated pushbutton switch 4.
4. Pull and hold stabilizer-blade lever 10 as far as it will go.
The quickhitch opens and unhitches the attachment.
Fig. 125
K
Fig. 126
40
4
10
Fig. 127

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson EZ17 and is the answer not in the manual?

Wacker Neuson EZ17 Specifications

General IconGeneral
BrandWacker Neuson
ModelEZ17
CategoryExcavators
LanguageEnglish

Related product manuals