EasyManua.ls Logo

Wacker Neuson EZ17 - Lubrication Work; Preparing Lubrication

Wacker Neuson EZ17
256 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7-24 OM EZ17 us 1.0 * ez17w700.fm
7
7.6 Lubrication work
Preparing lubrication
1. Stop the machine on firm, level and horizontal ground.
2. Position the boom straight ahead at the center of the machine.
3. Lower the boom and the stabilizer blade to the ground.
4. Stop the engine.
5. Operate the control lever repeatedly to release the pressure in the
hydraulic system.
6. Raise the control lever base.
7. Remove the starting key and carry it with you.
8. Remove loose objects from inside the machine.
9. Close and lock the engine cover and the other covers.
10.Attach a warning label to the control elements (for example “Machine
being serviced, do not start”).
11.Wait at least 10 minutes after stopping the engine!
Fig. 188

Table of Contents

Related product manuals