OM EZ17 us 1.0 * ez17b500.fm 5-9
5
Horn
Press button 5 on the right-hand control lever to actuate the horn.
Rotating beacon (option)
A rotating beacon can be fastened on the roof with a magnetic bracket.
Line routing on A pillar on the right.
Connection A is located on the right in the machine.
➥ The rotating beacon illuminates once the connection is established.
Observe the legal regulations of your country for operating the rotating
beacon.
Fig. 89 (shown from the rear)