OM EZ17 us 1.0 * ez17i400.fm 4-3
4
Unrolling/rolling up the rear tarp
1. Stop and park the machine. Stop the engine. See “Preparing
lubrication”.
2. Unhitch both straps A and unroll the rear tarp.
3. Fasten straps C at the 8 fastening points outside the canopy.
Do not unhitch both upper straps C when rolling up the tarp.