EasyManua.ls Logo

Wacker Neuson EZ17 - Page 144

Wacker Neuson EZ17
256 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-6 OM EZ17 us 1.0 * ez17t600.fm
6
1. see chapter “ Transporting” on page 2-11
2. Fit an empty standard bucket and lock it safely.
3. Remove all dirt from the machine.
4. Place the machine on firm, level and horizontal ground.
5. Tilt in the standard bucket and lower it to transport position.
6. Fully raise the boom.
7. Pull the stick toward the machine.
8. Raise the stabilizer blade.
9. Lock the upper carriage.
10.Position the boom straight ahead at the center of the machine.
Position the boom straight ah ead at the center o f the machine.
11.Stop the engine.
12.Operate the control lever repeatedly to release the pressure in the
hydraulic system.
13.Raise the control lever base.
14.Remove the starting key and carry it with you.
15.Remove loose objects from inside the machine.
16.Get off the machine, and close and lock all covers.
17.Install suitable slings at the points provided for lifting the machine.
18.Slowly raise the machine until there is no more contact with the
ground.
19.Wait until the machine does not swing any more.
20.If the balance and the condition and position of the slings is correct,
slowly raise the machine to the required height and load it.
Mandatory lengths L of the lifting gear:
Information
The manufacturer’s warranty shall not apply to accidents or damage
caused by loading or transporting the machine.
Fig. 163
L
L
Length Dimension
L Minimum 1300 mm (51 in)

Table of Contents

Related product manuals