EasyManua.ls Logo

Wacker Neuson WL 30 - Page 151

Wacker Neuson WL 30
246 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
S E R V I C I N G A N D I N S PE C T I O N
149
W L 3 0
Work to be performed
Operating hours:
250, 750, 1000,
1250, 1750,
2000, 2250,
2750, 3000, etc.
Operating
hours: 1500,
2500, 3500,
4500, etc.
monthly annually
Check all the oil levels X X
Check according to the Ordinance on Industrial Safety and Health X X
* Required if there is a damage in the hydraulic system which is supposed to be caused by strong abrasive wear
Valve clearance for Perkins 400 series: 0.2 mm (0.008”) inlet and outlet for a cold engine
Valve clearance for Perkins 1000 series: 0.2 mm (0.008”) inlet and 0.45 mm (0.04”) outlet for a cold engine
Valve clearance for Deutz 2011 series: 0.3 mm (0.012”) inlet and 0.5 mm (0.04”) outlet for a cold engine

Table of Contents

Related product manuals