Maintenance
6545−1/A1
Winterthur Gas & Diesel Ltd.
1/ 3
Maintenance
Tools:
2 Manual ratchet (WLL 1600 kg) 94016−007
4 Slings (WLL 1000 kg) 94657
1 Support (WLL 800 kg) 94658
1. General
Two auxiliary blowers (1, Fig. 1) are attached to the scavenge air receiver (2). For
more data about the auxiliary blower, refer to the Operation Manual 6545−1 Auxiliary
Blower and Switch Box.
Auxiliary blowers that do not operate for long periods must be started for a short time
two times each month. If this is not possible, turn the impeller with your hand. This is
necessary to prevent corrosion to the bearings. For the Inspection and Overhaul
intervals, refer to 0380−1, Group Auxiliary blower.
Fig. 1
WCH03556
I
I
1
1
2
Auxiliary Blower
2016