EasyManua.ls Logo

WinGD RT-flex50DF - Completion

Default Icon
586 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance
27081/A1
Winterthur Gas & Diesel Ltd.
5/ 5
6. Completion
1) Install the expansion piece, refer to 27511, paragraph 4.
2) Install the hydraulic pipe to the exhaust valve, refer to 84601.
3) Install the HP fuel pipe, refer to 87331.
4) Install the applicable HP pilot fuel pipes, refer to 87901.
5) Connect the cooling water pipe.
6) Connect the electrical connections to all injectors.
7) Connect all connections to cylinder cover and exhaust valve.
8) Connect the starting air pipe.
9) Open the valves you closed before (one valve each time) and do a check for
leaks.
10) Connect all other connections to the cylinder cover and exhaust valve.
11) Fill the cylinder cooling water system.
12) Set to on the cooling water pump
13) Make sure that cooling water is at the usual operation pressure and temperature.
14) Do a check for leaks.
15) Remove all tools and equipment from the work area.
2016
Cylinder Cover and Water Guide Jacket Removal and Installation

Table of Contents