Use of component designations
Some device names in the manual include the item designation in brackets, for example
[Q20], to make it possible to identify the components in the circuit diagrams of the drive.
Quick installation, commissioning and operation flowchart
SeeTask
Guidelines for planning the electrical install-
ation (page 65)
Plan the electrical installation and acquire the accessories needed
(cables, fuses, etc.).
Check the ratings, required cooling air flow, input power connec-
tion, compatibility of the motor, motor connection, and other
technical data.
Technical data (page 151)
Ambient conditions (page 167)
Check the installation site.
Mechanical installation (page 49)
Unpack and check the drive (only intact units may be started up).
Make sure that all necessary optional modules and equipment
are present and correct.
Install the drive mechanically.
Routing the cables (page 75)
Route the cables.
Electrical installation (page 83)
Connect the power cables.
Connect the control cables.
Installation checklist (page 117)
Check the installation.
If the drive has been non-operational for
more than one year, reform the DC link ca-
pacitors. See Converter module capacitor
reforming instructions (3BFE64059629
[English]).
Start-up (page 119)
Start the drive up.
ACS880 quick start-up guide, firmware
manual
Operate the drive: start, stop, speed control etc.
22 Introduction to the manual

Table of Contents

Other manuals for ABB ACS880-07CLC