3.4.13 Inspection of air hoses (Foundry Prime)
General
The air hoses on Foundry Prime robots must be inspected for leakage every six
months.
Required equipment
Art. no.Equipment, etc.
-Leak detection spray
-Pressure gauge
-Cut off valve
Procedure
For this test it is recommended that the air supply to the robot has a pressure
gauge and a cut-off valve connected.
NoteAction
Recommended pressure:Apply compressed air to the air connector on
robot base, and raise the pressure with the
knob until the correct value is shown on the
pressure gauge.
1
0.2-0.3 bar
xx1500002399
• A: Air connection robot
• B: Pressure gauge
• C: Cut off valve
• D: Air connection
It should take at least 5 seconds for the
pressure to reach 0 bar.
Close the cut off valve.2
The time is < 5 seconds:
• If the answer is YES: Localize the
leakage by following the procedures
below.
• If the answer is NO: The system is OK.
Remove the leak testing equipment.
3
Pressurize by opening the cut off valve.4
Continues on next page
148 Product manual - IRB 4600 Foundry Prime
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
3 Maintenance
3.4.13 Inspection of air hoses (Foundry Prime)