EasyManua.ls Logo

ABB IRB 4600 Foundry Prime - Introduction to Installation

ABB IRB 4600 Foundry Prime
408 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 Installation and commissioning
2.1 Introduction
General
This chapter contains assembly instructions and information for installing the IRB
4600 Foundry Prime at the working site.
More detailed technical data can be found in the Product specification for the IRB
4600 Foundry Prime, such as:
Load diagram
Permitted extra loads (equipment), if any
Location of extra loads (equipment), if any.
Safety information
Before any installation work is commenced, it is extremely important that all safety
information is observed.
There are general safety aspects that must be read through, as well as more specific
safety information that describes the danger and safety risks when performing the
procedures. Read the chapter Safety on page 17 before performing any installation
work.
Note
If the IRB 4600 Foundry Prime is connected to power, always make sure that the
robot is connected to protective earth before starting any installation work.
For more information see:
Product manual - IRC5
Product manual - IRB 4600 Foundry Prime 47
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
2 Installation and commissioning
2.1 Introduction

Table of Contents

Related product manuals