EasyManua.ls Logo

ABB IRB 4600 Foundry Prime - Product Manual - IRB

ABB IRB 4600 Foundry Prime
408 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DescriptionRevision
The following updates have been made in this revision:
A new SMB unit and battery is introduced, with longer battery lifetime.
Updated the list of approved detergents, see Approved cleaners and
detergents on page 193.
A
The following updates have been made in this revision:
Several more spare part numbers are corrected throughout the spare
part chapter.
The list of approved cleaners and detergents is updated more fre-
quently than the manual is updated, therefore the information is re-
moved from the manual and instead referenced. See Approved
cleaners and detergents on page 193.
B
The following updates have been made in this revision:
Added information about risks when scrapping a decommissioned
robot, see Scrapping of robot on page 384.
C
The following updates have been made in this revision:
Illustration changes in Dimension, mounting surface and guide bushing
on page 73.
Term "Guide sleeves" changed to "Guide bushings", see Dimension,
mounting surface and guide bushing on page 73.
A new WARNING! is added in the section about motor replacement,
informing not to mix different motor types.
Minor corrections.
D
The following updates have been made in this revision:
Note added in Fitting equipment on robot.
Foundry Prime: Seal armhouse cover with Sikaflex (several updates)
E
The following updates have been made in this revision:
Turning disc fixture is removed from special tools for Levelmeter cal-
ibration.
New illustrations for foundry prime air connections in manipulator
base, maintenance and repair chapter.
F
Published in release R16.2. The following updates are made in this revision:
Corrections due to updates in terminology.
New dimensional drawing of the turning disk added to Fitting equip-
ment on wrist and mounting flange on page 80.
New standard calibration method is introduced (Axis Calibration). See
Calibration on page 353.
Information about grounding point added. See Robot cabling and
connection points on page 94.
The spare part lists are removed from this manual. Valid spare part
lists are published in Product manual, spare parts - IRB 4600.
The maintenance schedule is revised, activities not valid for IRB 4600
were incorrectly added to the schedule previously. Faulty activities
are removed.
G
Published in release R17.1. The following updates are made in this revision:
Drying time for Mercasol added.
Changed the tightening torque of the oil plug located on axis-1 gear-
box.
Added information regarding tightening of protective calibration plugs
after calibration. Risk of damage on sealing washer if tightened too
hard.
H
Continues on next page
Product manual - IRB 4600 Foundry Prime 11
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
Overview of this manual
Continued

Table of Contents

Related product manuals