3.4.14 Inspection of surface treatment (Foundry Prime)
Introduction to inspection of surface treatment
Damage to painted surfaces must be repaired as soon as possible to avoid
corrosion. All painted surfaces on the robot must be inspected.
Required equipment
NoteEquipment, etc.
Touch up paint Foundry Prime 2, grey
Additional equipment - Foundry Prime
NoteArticle numberEquipment
Mercasol. Recommended
drying time is 24h.
3HAC034903-001Rust preventive
3HAC026759-001Sikaflex 521FC
12340011-116Loctite 574
Brush
3HAC035355-001Foundry Prime touch up kit
Inspection and repair of surface treatment
Use this procedure to inspect the surface treatment on Foundry Prime robots.
InformationAction
Inspect all painted surfaces for damages.1
Repair damages as described in the instruc-
tion included in the spare part kit.
2
150 Product manual - IRB 4600 Foundry Prime
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
3 Maintenance
3.4.14 Inspection of surface treatment (Foundry Prime)

Table of Contents

Related product manuals