Note
The expansion container is installed on delivery on the robot if ordered as option
suspended/inverted mounted. If a floor mounted robot shall be fitted in a
suspended mounted position, an expansion container must be installed. See
Installing an expansion container on page 89.
166 Product manual - IRB 4600 Foundry Prime
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
3 Maintenance
3.5.3 Changing the oil, axis-1 gearbox on suspended robots
Continued