EasyManua.ls Logo

ABB IRB 4600 Foundry Prime - Page 91

ABB IRB 4600 Foundry Prime
408 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InformationAction
xx1500001957
Fill oil in expansion container, and press
down the VK-cover. Secure with three screws
and washers.
7
Place the expansion container in the base
and place it so the drain holes match.
8
xx1500001959
Secure the expansion container with the at-
tachment screws and washers.
9
Tightening torque 6 Nm.
Check the o-ring used on the cover. Replace
it if damaged.
10
Refit the cover on the base with its attach-
ment screws.
11
Turn the robot so it is not suspended.12
Turn the robot to suspended position.13
See procedure for suspended robot, In-
specting oil level, axis 1 gearbox on
page 113.
Inspect the oil level.14
Product manual - IRB 4600 Foundry Prime 91
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
2 Installation and commissioning
2.6.1 Installing an expansion container
Continued

Table of Contents

Related product manuals