Refitting the concluding parts
Use this procedure to refit the concluding parts.
NoteAction
For art. no. see:
• Additional equipment - Foundry
Prime on page 340
xx0600002877
After fitting motor axis 1 on the robot, the
surface between motor and base must be
protected with rust preventive (Mercasol).
1
Parts:
• A: Mercasol on surface between
motor and base
• B: Motor axis 1
Clean and paint the joints that have been
opened. See Cut the paint or surface on the
robot before replacing parts on page 219
2
See section
• Inspection of air hoses (Foundry
Prime) on page 155
Perform an air leak test.3
Calibration is detailed in a separate calib-
ration manual enclosed with the calibra-
tion tools.
Recalibrate the robot.4
General calibration information is included
in section Calibration information on
page 439.
DANGER
Make sure all safety requirements are met
when performing the first test run. These
are further detailed in the section First test
run may cause injury or damage on page 29.
5
Product manual - IRB 6640 Foundry Prime 345
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.6.1 Replacing motor axis 1
Continued