EasyManua.ls Logo

ABB IRBT 2005 - Page 201

ABB IRBT 2005
290 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Illustration/NoteAction
CAUTION
The motor weighs 11 kg. All lifting accessories
used must be sized accordingly!
2
Attach the lifting chains to the eye bolts on the
motor and lift the motor into position on the
track with guidance from the locating cylindrical
pin.
xx1400001627
A Ø 17xØ 11x2 washer,
3HAB4233-1
B M10x40 hex socket head cap
installation screw, 3HAB3409-
50 (8 pcs)
C Cable chain support
Fit the drive train on the drive train bracket with
the screws and plain washers.
Note
Do not tighten the screws yet.
3
Adjust the backlash of the gear motor. For how
to adjust the gear motor backlash, see Adjust-
ing the gearbox backlash on page 229.
4
xx1400001630
Tighten the screws and plain washers in se-
quence shown in the illustration.
5
Tightening torque: 70 Nm
For the mirrored cable chain orientation, refit
the cable chain support with two screws.
6
Reconnect the power and signal cables to the
motor.
7
Continues on next page
Product manual - IRBT 2005 201
3HAC051130-001 Revision: F
© Copyright 2015 - 2018 ABB. All rights reserved.
4 Repair
4.6.1 Replacing the motor
Continued

Table of Contents

Related product manuals