2.3.3 Unpacking
Inspection
The track motion IRBT 2005 has been pre-assembled in ABB factory. For delivery
and storage's convenience, it would be divided into several segments as an unit
depending on the length of the track when delivered.
The track IRBT 2005 is wrapped in plastic. Unpack the track and inspect for any
visible transport damage. If the track motion is damaged, contact ABB.
Contents
As standard, the track motion IRBT 2005 includes the following on delivery:
Track motion IRBT 2005 segments depending on the length
Cleaning
Before transport, the track motion IRBT 2005 has been protected against rust by
a thin film of oil that has been applied before packing.
Note
Do not clean any of the pre-lubricated linear guide and rack.
Illustration/NoteAction
Wipe off any surplus oil using a lint-free
cloth.
1
Product manual - IRBT 2005 51
3HAC051130-001 Revision: F
© Copyright 2015 - 2018 ABB. All rights reserved.
2 Installation and commissioning
2.3.3 Unpacking

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB IRBT 2005 and is the answer not in the manual?

ABB IRBT 2005 Specifications

General IconGeneral
BrandABB
ModelIRBT 2005
CategoryRobotics
LanguageEnglish

Related product manuals