EasyManua.ls Logo

ABB PFEA 112 - Chapter 2 Installation; About this Chapter; Safety Instructions; Mounting the Load Cells

ABB PFEA 112
216 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Tension Electronics PFEA111/112, User Manual
Section 2.1 About this Chapter
3BSE029380R0101 Rev C 2-1
Chapter 2 Installation
2.1 About this Chapter
The way you install your system has more influence on its functionality, accuracy and reliability
than you might think. The more accurate the installation, the better the measurement system. By
following the instructions in this chapter, you will fulfill the most important requirements for
proper mechanical and electrical installation.
The equipment is a precision instrument which, although intended for severe operating
conditions, must be handled with care.
2.2 Safety Instructions
Read and follow the safety instructions given in Chapter 1 , before starting any installation
work. However, local statutory regulations, if stricter, are to take precedence.
2.3 Mounting the Load Cells
Installation requirements and mounting instructions are given in:
Appendix B PFCL 301E - Designing the Load Cell Installation
Appendix C PFTL 301E - Designing the Load Cell Installation
Appendix D PFRL 101 - Designing the Load Cell Installation
Appendix E PFTL 101 - Designing the Load Cell Installation
Appendix F PFCL 201 - Designing the Load Cell Installation
Appendix G PFTL 201 - Designing the Load Cell Installation

Table of Contents

Related product manuals