EasyManua.ls Logo

biosystems A25 - Changing the Washing Pumps; Changing the Load Cell of the Level Control Scales

biosystems A25
147 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service manual
116
5.1.3.13. Changing the washing pumps
a) Remove the front housing.
b) Disconnect the PVC tubes from the pumps and from the wash electrovalve.
c) Remove the 3 screws that hold the pump support to the base.
d) Fit the new pump.
5.1.3.14. Changing the load cell of the level control scales
a) Remove the front housing.
b) Disconnect the electrical hose and remove the screws that hold the load cell to the base.
c) Remove the load cell to be changed.
d) Fit the new load cell. The load cell is very sensitive and must be handled with care. Any slight knock may deform it and
render it useless.

Table of Contents