EasyManua.ls Logo

BRP ROTAX 916 i A Series - Page 203

BRP ROTAX 916 i A Series
223 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BRP-Rotax
INSTALLATION MANUAL
13. Carefully check all lubrication system connections, lines and clamps for leaks and tightness.
ENVIRONMENTAL NOTE
Protect the environment! Do not spill oil and pay attention for adequate disposal.
Figure 12.12: Setup for venting the oil system, TYPICAL
1 Suction line 2 Oil return line
3 Free end 4
Temporary oil collection tank
5
Oil return line (Turbocharger)
6
Vent fitting
7
2 x Screw socket (Oil inlet)
8
Temporary connection for purging
Effectivity: 916 i A / C24
Edition 0/Rev. 1
79–00–00
Page 19
December 01 2023

Table of Contents

Other manuals for BRP ROTAX 916 i A Series

Related product manuals