EasyManua.ls Logo

Cisco ONS 15454 - Page 255

Cisco ONS 15454
516 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 147: Engaging the Deep-Front Panel and Shelf
Step 5 Slide the deep-front panel screws inwards using the plastic tabs to engage the retention features and the pins
with the shelf notches and hinges (see the following figure). Verify the engagement by gently applying outward
pressure to the panel.
Figure 148: Engaging the Deep-Front Panel and Shelf
Step 6 Lock the deep-front panel by tightening the screws to a torque value of 6.5 in-lb (0.75 N-m).
Step 7 Connect the other end of the ground strap cable to the ground point present on the deep-front panel exterior.
Cisco ONS 15454 Hardware Installation Guide
225
Installing the ONS 15454 M2 Shelf
NTP-G343 Install the Deep-Front Panel of the ONS 15454 M2 Shelf

Table of Contents

Other manuals for Cisco ONS 15454

Related product manuals