EasyManua.ls Logo

Daikin D-BACS - DII-NET Plus Adaptor; DIII-NET Plus Adaptor

Daikin D-BACS
376 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.8 DIII-NET Plus Adaptor 109
intelligent Touch Controller
5.8 DIII-NET Plus Adaptor
z Use a round crimp terminal with reinforcing sleeve for safety wiring connection to this unit.
*
*
*
DAIKIN
F1 F2
F1
F2
F1 F2 F1 F2 F1 F2 F1 F2
F1 F2
Polarity : No
Pi3
3-M4
Pi2
DCS601A52
N
Standard accessory
0.75~1.25mm
2
vinyl cord or cable with up to
150m maximum.
Pi1
RS232-C
Measuring meter × 3
(Where Power Proportional
Distribution Card as option is used)
Power supply wiring 2.0mm
2
Implement the grounding in accordance with the
standards of the applicable county and region.
Earth wiring 2.0mm
2
F2
RS232C
Pi1
DCS601C51
RS232 - C
*RS232C wiring
DCS601A52
Wirings must be isolated from the power lines.
RS232 - C Cable (10m) *Standard accessory
L
F1
*DIII - NET wiring
6-M3.5
Pi2
The measuring meters to be connected must meet the requirements specified below.
1. To be a measuring meter with pulse oscillator. (pulse/kwh)
2. Pulse band of 100msec or mores
3. Measuring meter which uses semiconductor relay for pulse output and outputs pulses from non-voltage
contact1. Use a no voltage contact.
4. Use a contact which can guarantee minimum application load DC16V and 10mA.
5. Wirings must be isolated from the power lines.
6. Terminal contact size : M3.5.
DCS601A52
*Measuring meter
Earth leakage breaker
10A
Power supply
Single phase
100 - 240V
(50/60Hz)
1. Do not use multicore cables with three or more cores.
2. Use wires of sizes between 0.75mm
2
and 1.25mm
2
3. Wire length : Max 1000m
4. Do not bind the wire for DIII-NET
5. Wirings for DIII-NET must be isolated from the power lines.
6. Terminal contact size : M3.5
DIII-NET Plus Adapter
COM
Pi3
Outdoor unit
maximum of 64groups
COM
RS232C

Table of Contents