EasyManua.ls Logo

Daikin D-BACS - Page 332

Daikin D-BACS
376 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1.6 Di Unit (DEC101A51) 315
Adaptor
40
80
Fix the DEC101A51
firmly with the installation
screws(M4)
325
40
140
40
40
(To Remove Front Panel: )
"
Electric Wiring Connection" , "
Wiring Specification" and "
Initial Setting"
should be performed with the front panel removed. The front panel can be removed
by detaching 2 front panel screws shown in the figure above and sliding it lightly to
the upper side . Upon completion of all wiring connections and setting operations,
close the front panel as it was and screw it firmly.
DEC101A51 DEC101A51
DEC101A51 DEC101A51
In case where several devices are set up and installation inside the power board is
carried out, each equipment installation space and space between the wall surface and
this equipment should be left at least as shown below.
Restrictions
in Continuous Installation

Table of Contents

Related product manuals