EasyManua.ls Logo

Daikin D-BACS - Page 7

Daikin D-BACS
376 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
vi
12. Control-related Design Keypoints ..............................239
12-1 Introduction.................................................................... 239
12-2 System Configuration.................................................... 239
12-3 Hardware....................................................................... 241
12-4 Outline of Functions ...................................................... 242
12-5 LON Communication Specifications.............................. 247
12-6 Monitoring and Control Restrictions .............................. 249
13. Workflow .......................................................................251
14. Check Sheet for Control and Monitoring Items.........252
Part 9 Power Proportional Distribution
(P.P.D.) ..................................................... 255
1. P.P.D. Design Guide.....................................................256
1-1 System Architecture ...................................................... 256
1-2 Design Precautions ....................................................... 257
1-3 Connection other than VRV........................................... 260
1-4 Conditions and Method to Exclude Calculation for
Specified Indoor Unit..................................................... 261
1-5 Explanations of Power Proportional Distribution ........... 262
1-6 Notes............................................................................. 267
2. intelligent Touch Controller (DCS601C51) with
the Software for P.P.D. Application (DCS002C51)
Including PCMCIA ........................................................269
3. intelligent Touch Controller (DCS601C51) with
the Software for P.P.D. Application (DCS002C51)
Including PCMCIA Card and with the Software for
WEB Usage (DCS004A51)............................................270
4. intelligent Manager III (DAM602B51) with
P.P.D. Application ........................................................271
5. Interface for Use in BACnet
®
(DMS502B51) with
P.P.D. Application Using Optional Di Board
(DAM412 B51) ...............................................................272
Part 10Adaptor .................................................... 273
1. Adaptor for System......................................................274
1-1 <DCS302A52> Unification Adaptor for
Computerized Control ................................................... 274
1-2 <KRP2A61 / KRP2A62 / KRP2A53>
Wiring Adaptor for Electrical Appendices (1)................. 277
1-3 <DTA104A61 / DTA104A62 / DTA104A53>
External Control Adaptor for Outdoor Unit
(Must be Installed on Indoor Units) ............................... 287
1-4 <DTA109A51> DIII-NET Expander Adaptor.................. 295
1-5 Dio Unit (DEC102A51) .................................................. 299
1-6 Di Unit (DEC101A51) .................................................... 311
1-7 Ai Unit (DAM101A51) .................................................... 320

Table of Contents

Related product manuals