3 Placing into operation
3.1 Switch-on
Operating instructions 05/10 MN05013003Z-EN www.eaton.com 51
3 Placing into operation
3.1 Switch-on
Before switching on easy, check that you have connected the power supply
terminals and inputs correctly:
• 24 V AC version easy-AB
• Terminal L: Phase conductor L
• Terminal N: Neutral conductor N
• Terminals I1 to I12:
Actuation via same phase conductor L
• 230 V AC version easy-AC
• Terminal L: Phase conductor L
• Terminal N: Neutral conductor N
• Terminals I1 to I12, R1 to R12:
Actuation via phase conductor L
• 12 V DC version:
• Terminal +12 V: voltage +12 V
• Terminal 0 V: Voltage 0 V
• Terminals I1 to I12:
Actuation via same +12 V
• 24 V DC version:
• Terminal +24 V: Voltage +24 V
• Terminal 0 V: Voltage 0 V
• Terminals I1 to I12, R1 to R12:
Actuation via the same +24 V
If you have already integrated easy into a system, secure any parts of the
system connected to the operating range to prevent access and ensure that
no-one can be injured if, for example, motors start up unexpectedly.
3.2 Setting the menu language
When you switch on easy for the first time, you will be asked to select the
menu language.
▶ Use the cursor buttons
Í or Ú to select the language required.
• English
• Deutsch
• French
• Spanish
• Italian
• Portuguese
• Dutch
• Swedish
• Polish
• Turkish
• Czech
• Hungarian
▶ Press OK to confirm your choice and press ESC to exit the menu.
ENGLISH å
DEUTSCH
FRANCAIS
ESPANOL